My current work in progress:

1. Segel, designed by Lea Viktoria, knit from Miss Babs Yummy 2-Ply Toes in the "Draco" gradient set on a 3.5 mm (U.S. size 4) needle.
2. Myriad stealth projects.

Knitting Time

It is interesting that considering I’ve had way more knitting time in the past few days than I usually do, I’ve shown far less knitting on my blog.

The federal government was closed today so I had another day at home. I did go out to the grocery store and post office. That was . . . interesting. Some streets were passable, some not so much. Most public transport systems here were severely curtailed today.

If the government will be open tomorrow, they’ll need to have public transportation up and running, and hopefully have plowed some more streets. I guess we’ll just have to wait and see.

Oh, and there’s another storm supposed to hit us tomorrow afternoon that the weather people are predicting will dump 10 – 20 inches on us. Hard to believe!

I did finish the first of my Manly Aran socks:

ManlyAran020610 160x240 Knitting Time

I’m plugging away on the second sock.

And I started something else lacy . . .

lace020810 240x160 Knitting Time

In other news, I think Lucy is good and sick of having me at home.

lucy020810 240x160 Knitting Time

“Just go to work, will ya?”