My current work in progress:

Aspen, designed by Michele Wang, knit from Elsa Wool Woolen Spun Worsted Weight Cormo

New Year, Old Project

Happy New Year!

I’ve spent the first week of the year knitting along on Granito.

WIPCloseup010817 240x135 New Year, Old Project

But the end is in sight! I am almost done with the body and have just started knitting the bottom ribbing. I worked until I was almost out of yarn. I’ve reserved enough for 10 or so rounds of ribbing.

WIP010817 172x240 New Year, Old Project

Meanwhile, Loki is doing his impression of a hermit crab.

Loki010817 240x156 New Year, Old Project

Comments

  1. What a pretty lettuce green!

    I hope Loki gets out of there before the tide comes in. 😉

  2. SO close I can`t wait to see it done. I bet you feel about the same way

  3. I have the same bag Loki has, in red. I love it!

  4. Lovely, classic and oh-so wearable. Looking forward to the FO.

  5. Sophy0075 says:

    Smart Loki! Hibernating in these freezing temps is a great idea. So is knitting a pretty sweater, and deciding on the ribbing length when the rest of the sweater is done, as you have.